Safety-4
Safety-4
TX / TXH / TXB 180S - 400L (4/07)
TX / TXH / TXB 180S - 400L (4/07)
explosion.
explosion.
1.
1.
Keep all m
Keep all m
eta
eta
l too
l too
ls aw
ls aw
ay fr
ay fr
om bat
om bat
ter
ter
y ter
y ter
mi-
mi-
nals.
nals.
2.
2.
Batter
Batter
ies
ies
conta
conta
in s
in s
ulfur
ulfur
ic a
ic a
cid
cid
which
which
will
will
burn
burn
skin on contact; wear rubber gloves and eye
skin on contact; wear rubber gloves and eye
protection when working with batteries.
protection when working with batteries.
3.
3.
Flu
Flu
sh ey
sh ey
es or w
es or w
ash s
ash s
kin w
kin w
ith w
ith w
ate
ate
r and s
r and s
eek
eek
medical attention immediately in case of
medical attention immediately in case of
contact.
contact.
4.
4.
Wh
Wh
en
en
ju
ju
mp
mp
st
st
ar
ar
ti
ti
ng:
ng:
a.
a.
Do no
Do no
t lea
t lea
n ove
n ove
r the
r the
bat
bat
ter
ter
y whi
y whi
le ma
le ma
kin
kin
g
g
connection.
connection.
b.
b.
The
The
n, co
n, co
nne
nne
ct th
ct th
e nega
e nega
tiv
tiv
e (-) te
e (-) te
rmi
rmi
nal of
nal of
the booster battery to the engine or body
the booster battery to the engine or body
ground (-).
ground (-).
Never Cross
Never Cross
Polarity of
Polarity of
Terminals.
Terminals.
c.
c.
Dis
Dis
con
con
nec
nec
t cab
t cab
les in ex
les in ex
act re
act re
ver
ver
se ord
se ord
er
er
.
.
Lock-Out /
Lock-Out /
T
T
ag-Out Procedure
ag-Out Procedure
Purpose.
Purpose.
This procedure establishes the mini-
This procedure establishes the mini-
mum requirements for lock-out / tag-out of energy
mum requirements for lock-out / tag-out of energy
sources that
sources that
could cause
could cause
injury to
injury to
personnel.
personnel.
All
All
employees shall comply with the procedure.
employees shall comply with the procedure.
Responsibility.
Responsibility.
The responsibilit
The responsibilit
y for
y for
seeing that
seeing that
this procedure is followed is binding upon all
this procedure is followed is binding upon all
employees.
employees.
All employees
All employees
shall be
shall be
instructed in
instructed in
the safety significance of the lock-out / tag-out
the safety significance of the lock-out / tag-out
procedure by
procedure by
(designate individual).
(designate individual).
Each new
Each new
or
or
transferred affected employee shall be instructed
transferred affected employee shall be instructed
by (designate individuals) in the purpose and use
by (designate individuals) in the purpose and use
of the lock-out / tag-out procedure.
of the lock-out / tag-out procedure.
Preparation for Lock-Out
Preparation for Lock-Out
/ Tag-Out.
/ Tag-Out.
Employees
Employees
authorized to perform lockout / tagout shall be cer-
authorized to perform lockout / tagout shall be cer-
tain as to which switch, valve, or other energy iso-
tain as to which switch, valve, or other energy iso-
lating devices apply to the equipment being
lating devices apply to the equipment being
locked out
locked out
/ tagged out
/ tagged out
.
.
More than one
More than one
energy
energy
source (electrical, mechanical, or others) may be
source (electrical, mechanical, or others) may be
involved.
involved.
Any
Any
questionable identif
questionable identif
ication
ication
of
of
sources shall be cleared by the employees with
sources shall be cleared by the employees with
their supervisors.
their supervisors.
Before lock-out
Before lock-out
/ tag-out
/ tag-out
com-
com-
mences, job authorization should be obtained.
mences, job authorization should be obtained.
Sequence of Lock-Out /
Sequence of Lock-Out /
Tag
Tag
-Out
-Out
Procedure
Procedure
1.
1.
Notif
Notif
y al
y al
l af
l af
fect
fect
ed emp
ed emp
loyees
loyees
that
that
a lock
a lock
-out
-out
/
/
tag-out is required and the reason therefor.
tag-out is required and the reason therefor.
2.
2.
If th
If th
e equ
e equ
ipm
ipm
ent i
ent i
s ope
s ope
rat
rat
ing
ing
, shu
, shu
t it do
t it do
wn by
wn by
the normal stopping procedure.
the normal stopping procedure.
3.
3.
Operat
Operat
e th
e th
e sw
e sw
itch,
itch,
valve
valve
, or
, or
other
other
energy
energy
iso-
iso-
lating device so that the energy source(s)
lating device so that the energy source(s)
(electrical, mechanical, hydraulic, etc.) is dis-
(electrical, mechanical, hydraulic, etc.) is dis-
connected or isolated from the equipment.
connected or isolated from the equipment.
Stored energy, such as that in capacitors,
Stored energy, such as that in capacitors,
springs, elevated crane members, rotating fly-
springs, elevated crane members, rotating fly-
wheels, hydraulic systems, and air, gas,
wheels, hydraulic systems, and air, gas,
steam, or water pressure, etc. must also be
steam, or water pressure, etc. must also be
dissipated or restrained by methods such as
dissipated or restrained by methods such as
grounding, repositioning, blocking, bleeding-
grounding, repositioning, blocking, bleeding-
down, etc.
down, etc.
4.
4.
Lock-o
Lock-o
ut /
ut /
tag-ou
tag-ou
t th
t th
e en
e en
ergy
ergy
isolat
isolat
ing
ing
devic
devic
es
es
with an assigned individual lock / tag.
with an assigned individual lock / tag.
5.
5.
Aft
Aft
er en
er en
sur
sur
ing t
ing t
hat n
hat n
o pers
o pers
onn
onn
el are e
el are e
xpo
xpo
sed
sed
and as a check on having disconnected the
and as a check on having disconnected the
energy sources, operate the push button or
energy sources, operate the push button or
other normal operating controls to make cer-
other normal operating controls to make cer-
tain the equipment will not operate.
tain the equipment will not operate.
Return operating controls to
Return operating controls to
neutral after the test.
neutral after the test.
6.
6.
The eq
The eq
uip
uip
men
men
t is no
t is no
w loc
w loc
ked ou
ked ou
t / tag
t / tag
ged ou
ged ou
t.
t.
Restoring Equipment to Service
Restoring Equipment to Service
1.
1.
Whe
Whe
n the j
n the j
ob is
ob is
com
com
plet
plet
e and e
e and e
qui
qui
pme
pme
nt is
nt is
ready for testing or normal service, check the
ready for testing or normal service, check the
equipment area to see that no one is exposed.
equipment area to see that no one is exposed.
2.
2.
When e
When e
quipme
quipme
nt is
nt is
all c
all c
lear
lear
, rem
, rem
ove a
ove a
ll lo
ll lo
cks
cks
/
/
tags.
tags.
The energy
The energy
isolating devices
isolating devices
may be
may be
operated to restore energy to equipment.
operated to restore energy to equipment.
Procedure Involving More Than One Person.
Procedure Involving More Than One Person.
In the preceding steps, if more than one individual
In the preceding steps, if more than one individual
is required to lock-out / tag-out equipment, each
is required to lock-out / tag-out equipment, each
shall place his own personal lock / tag on the
shall place his own personal lock / tag on the
energy isolating
energy isolating
device(s).
device(s).
One designated
One designated
indi-
indi-
vidual of a work crew or a supervisor, with the
vidual of a work crew or a supervisor, with the
knowledge of the crew, may lock-out / tag-out
knowledge of the crew, may lock-out / tag-out
equipment for the whole crew
equipment for the whole crew
.
.
In such cases,
In such cases,
it
it
shall be the responsibility of the individual to carry
shall be the responsibility of the individual to carry
out all steps of the lock-out / tag-out procedure
out all steps of the lock-out / tag-out procedure
and inform the crew when it is safe to work on the
and inform the crew when it is safe to work on the
equipment.
equipment.
Additionally
Additionally
, the
, the
designated indiv
designated indiv
idual
idual
shall not remove a crew lock / tag until it has been
shall not remove a crew lock / tag until it has been
verified that all individuals are clear.
verified that all individuals are clear.
Rules for Using Lock-Out / Tag-Out Procedure.
Rules for Using Lock-Out / Tag-Out Procedure.
All equipment shall
All equipment shall
be locked out
be locked out
/ tagged out
/ tagged out
to
to
protect against accidental or inadvertent operation
protect against accidental or inadvertent operation
when such operation could cause injury to person-
when such operation could cause injury to person-
nel.
nel.
Do not attempt
Do not attempt
to operate any
to operate any
switch, valve,
switch, valve,
or other energy isolating device bearing a lock /
or other energy isolating device bearing a lock /
tag.
tag.
https://www.forkliftpdfmanuals.com/
Summary of Contents for TX180S
Page 5: ...https www forkliftpdfmanuals com...
Page 13: ...1 2 1 2 Rev 11 94 Rev 11 94 https www forkliftpdfmanuals com...
Page 15: ...https www forkliftpdfmanuals com...
Page 17: ...https www forkliftpdfmanuals com...
Page 54: ...Hoist Circuit Hoist Circuit https www forkliftpdfmanuals com...
Page 83: ...https www forkliftpdfmanuals com...
Page 84: ...https www forkliftpdfmanuals com...
Page 85: ...https www forkliftpdfmanuals com...
Page 86: ...https www forkliftpdfmanuals com...
Page 144: ...o o l l e e r r https www forkliftpdfmanuals com...
Page 193: ...https www forkliftpdfmanuals com...
Page 216: ...Section 15C Section 15C https www forkliftpdfmanuals com...
Page 222: ...Hoist Circuit Hoist Circuit https www forkliftpdfmanuals com...
Page 234: ...https www forkliftpdfmanuals com...
Page 243: ...https www forkliftpdfmanuals com...
Page 245: ...https www forkliftpdfmanuals com...
Page 272: ...https www forkliftpdfmanuals com...
Page 274: ...https www forkliftpdfmanuals com...
Page 290: ...TX TXH TXB 180S 400L 07 TX TXH TXB 180S 400L 07 https www forkliftpdfmanuals com...