7-26 ELECTRICAL SYSTEM
CKP sensor
CKP sensor
coupler
ECM
coupler
Peak
volt
adaptor
CKP SENSOR PEAK VOLTAGE
• Remove the front seat. (
6-8)
NOTE:
Be sure that all couplers are connected properly and the battery
used is in fully-charged condition.
• Connect the multi circuit tester with peak volt adaptor as fol-
lows.
• Measure the CKP sensor peak voltage between White and
Green lead wires at the ECM coupler.
Green (
+
Probe) – White (
-
Probe)
09900-25008: Multi circuit tester set
Tester knob indication: Voltage (
)
When using the multi circuit tester and peak volt adap-
tor, follow the instruction manual.
• Shift the transmission into the neutral and turn ignition switch
“ON”.
• Crank the engine a few seconds with the starter motor by de-
pressing starter button and check the CKP sensor peak volt-
age.
• Repeat the above test procedure a few times and measure the
highest peak voltage.
CKP sensor peak voltage: More than 0.5 V
(Green–White)
If the peak voltage is lower than the standard range, check the
peak voltage at the CKP sensor lead wire coupler.
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...