FI SYSTEM AND INTAKE AIR SYSTEM 4-77
THROTTLE VALVE SYNCHRONIZATION
Check and adjust the throttle valve synchronization among four
cylinders.
CALIBRATING EACH GAUGE
• Lift and support the fuel tank. (
4-51)
• Start up the engine and run it in idling condition for warming
up.
• Stop the warmed-up engine.
• Disconnect the IAT sensor coupler
1
and remove the IAT sen-
sor from the air cleaner box.
• Connect the removed IAT sensor to its coupler and place it on
the frame.
• Remove the IAP sensor mounting screw
2
.
• Remove the air cleaner box. (
4-61 and -62)
• Disconnect the vacuum hose
3
from the No.4 throttle body.
• Connect the proper rubber cap
4
to the nipple on the No.4
throttle body.
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...