COOLING AND LUBRICATION SYSTEM 5-5
WATER HOSE INSPECTION
• Remove the under cowling. (
6-5)
• Any water hose found in a cracked condition or flattened must
be replaced.
• Any leakage from the connecting section should be corrected
by proper tightening.
RADIATOR REMOUNTING
• Install the radiator.
• Route the radiator hoses. (
8-24)
• Pour engine coolant. (
2-18)
• Bleed the air from the cooling circuit. (
2-19)
• Install the under cowling. (
6-5)
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...