
ENGINE 3-73
TRANSMISSION
• Install the bearing pins
1
and the C-ring
2
on the upper crank-
case.
• Install the countershaft assembly on the upper crankcase.
NOTE:
Align the C-ring with the groove on the bearing and the bearing
pin with the indent on the bearing.
• Install the driveshaft assembly on the upper crankcase.
NOTE:
Align the bearing ring with the groove on the crankcase and the
bearing pin with the indent on the bearing.
• Install the oil seal
1
.
• Turn the bearings to install the bearing dowel pins
A
in the re-
spective positions.
• Install the O-rings.
• Install the dowel pins
1
.
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...