ENGINE 3-47
115 N.m
11.5 kgf.m
83.2 lb-ft
(
)
TRANSMISSION
• Disassemble the countershaft and drive shaft.
Pay attention to the following point.
[
09900-06104: Snap ring pliers
• Remove the 6th drive gear circlip from its groove and slide it
towards the 3rd/4th drive gear.
• Slide the 6th
1
and 2nd
2
drive gears toward the 3rd/4th drive
gears, then remove the 2nd drive gear circlip
3
.
1
Countershaft/1st drive gear
2
5th drive gear
3
3rd/4th drive gear
4
6th drive gear
5
2nd drive gear
6
Driveshaft
7
2nd driven gear
8
6th driven gear
9
3rd driven gear
0
4th driven gear
A
5th driven gear
B
1st driven gear
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...