
CHASSIS 6-35
• Remove the handlebar set bolts.
• With the handlebar clamp bolts and steering stem head nut
loosened, remove the steering stem upper bracket.
• With the handlebar clamp bolts loosened, draw out the handle-
bars to upward.
REASSEMBLY AND REMOUNTING
Reassemble and remount the handlebar in the reverse order of
removal and disassembly.
Pay attention to the following points:
• Install the handlebars temporaly.
• Install the steering stem upper bracket.
NOTE:
If it is difficult to install the steering stem upper bracket, loosen
the axle pinch bolts of right front fork.
• Tighten the steering stem head nut.
!
!
!
!
!
Steering stem head nut: 90 N.m (9.0 kgf.m, 65.0 lb-ft)
• Tighten the front fork upper clamp bolts.
!
!
!
!
!
Front fork upper clamp bolt: 23 N.m (2.3 kgf.m, 16.5 lb-ft)
Summary of Contents for GSX-R750
Page 1: ...GSX R750 SUZUKI MOTOR CORPORATION PRINTED IN JAPAN FEBRUARY 2000 99500 37112 03E...
Page 46: ...PERIODIC MAINTENANCE 2 29...
Page 97: ...ENGINE 3 49 Driveshaft Countershaft TRANSMISSION PARTS LOCATION...
Page 172: ...FISYSTEMANDINTAKEAIRSYSTEM 4 25 FI SYSTEM WIRING DIAGRAM...
Page 249: ...5 20 COOLINGANDLUBRICATIONSYSTEM ENGINE LUBRICATION SYSTEM MAIN GALLERY To sub gallery...
Page 250: ...COOLINGANDLUBRICATIONSYSTEM 5 21...