
Sunny Boy 700
Technical Description
SB700-11:EE
-
68
-
SMA Regelsysteme GmbH
7 Troubleshooting
Our quality management strategy includes a constant quality improvement of our
products. We always are concerned to avoid all failures and malfunctions of our
products.
The product you purchased was shipped after successfully passing numerous tests
concerning the operation behavior, the disconnection devices and a long term heavy
duty tests.
We recommend to conduct the following steps in case your PV-plant does not oper-
ate correctly:
•
Check the blink code on the lid of the Sunny Boy and compare the code with
the blink codes listed in chapter 5. Follow the countermeasures listed there, if
necessary contact the installer.
•
Check the “Status“ and “Failure“ messages in one of the monitoring system de-
scribed in chapter 6 if present.
•
Contact the Sunny Boy service if the system malfunction consists. The address
is listed in the appendix.