
Sunny Boy 700
Technical Description
SB700-11:EE
-
16
-
SMA Regelsysteme GmbH
3 Installation
The installation of the Sunny Boy string inverter must be done by
qualified personnel that is approved by the local electricity company.
Make sure that all instructions in this chapter are followed.
Follow all safety regulations and regulations of the local electricity
company.
3.1 What must be done in case of transport damages?
The inverters are thoroughly checked before they are shipped. Even though they are
delivered in a sturdy packaging (which can be recycled) the inverters can be dam-
aged in transit, which is usually the forwarder’s fault.
Please inspect your inverter thoroughly after it is delivered. If any damages can be
detected on the packaging that could make you conclude the contents is damaged or
if you detect that the inverter is damaged please immediately notify the forwarding
company.
SMA or your local supplier can help you in this matter. In any case a declaration of
transport damage must be made within 6 days upon receipt of the product and must
be stated in writing directly to the forwarding agent. If it is necessary to return the
inverter to the manufacturer please use the packaging the inverter was sent in.