
Sunny Boy 700
Technical Description
SB700-11:EE
-
24
-
SMA Regelsysteme GmbH
Socket
Socket tube
Rubber ring
for PG13.5
Fastening case
for PG13.5
Cable seal PG16
Cable seal PG13.5
Threaded ring
Fig. 3.4: AC connection socket
•
Push the rubber ring into the fastening case.
•
Put the cable through the PG 13.5 or 16 cable seal. Put the cable through the
fastening case with the rubber ring and through the socket tube.
•
Connect the wires of the AC cable as follows:
−
Protective Earth (PE) to the terminal with the “ground” symbol
−
Neutral wire to the terminal marked with “1”
−
Phase L to the terminal marked with “2”
−
The terminal marked with “3” is not used.
•
Make sure that all wires are firmly connected.
•
Push the socket tube firmly onto the socket.
•
Screw the cable seal firmly onto the socket tube.
•
For cables that require the PG16 gland: Tighten the bolt of the PG16 gland.
•
The AC connector socket is now ready to use.
•
Seal the AC connector socket in case you do not insert it into the Sunny Boy.