
Sunny Boy 700
Technical Description
SB700-11:EE
-
61
-
SMA Regelsysteme GmbH
•
Lead the communication cable through the contact unit of the PG cable gland.
•
Connect the terminal cables to the terminal strip of the system control board
and check whether they are firmly fastened.
•
Fasten the cable seal of the PG16 cable gland.
•
If you have installed RS232 cabling please close the opening in the bottom with
the seal included in the packing list.
•
Close the device as described in chapter 5.1.