46
5-9
5-10
1
5-11
Operation
5.4
Preparation
•
The operator should be familiar with the warnings
and cautions
•
The operator should be qualifi ed to work with the
machine.
•
Alwaysensure that the wheel guard is lifted and the
gauge arm is in its home position (fully retracted).
5.4.1
Power up
•
Do not keep any key pressed during power up.
Refer to (
Fig. 5-9
).
•
Insert the power cable plug in the mains socket “
1
”.
•
Set the start switch to the “
I
” position.
Note
:
If the unit beeps and does not proceed or
if an error code is shown, refer to Chapter
(
F
7
).
The unit will beep and perform a self-test now.
After switch on the fi rst screen page shown is
INTRO
SCREEN
(
Fig. 5-10
).
The unit is now ready for commands.
Note
:
From the
INTRO SCREEN
page, you
can switch directly to the
RIM DATA
ENTRY
screen page (
Fig. 5-11
) by simply
removing the detecting device for wheel
data acquisition.
Summary of Contents for Sun SWB 340
Page 142: ...142 Blank Page...