HRX-OM-S004
Chapter 5 Display and setting of various functions
5.8
Ready completion (TEMP READY) signal
HRS Series
5-20
5.8.2
Ready completion (TEMP READY) signal setting / checking
The table below shows explanation and default of the set items for ready
completion (TEMP READY) signal.
Table 5.8-1 Set items for ready completion (TEMP READY) signal
Display
Item
Content
Default
READY
mode
Sets ready completion (TEMP READY)
signal
OFF
READY bandwidth
(range between the
upper and lower
limit temperatures)
Sets temperature for ready completion
(TEMP READY) signal.
----
READY time
Sets time for ready completion (TEMP
READY) signal.
----
1.
Press and hold the [MENU] key for approximately 2 seconds.
Repeat pressing the key until the button-lock setting display [
] appears on the
digital display.
PV
SV
PV
SV
PV
SV
Setting/checking: READY mode
2.
Press the [SEL] key 3 times.
Setting screen of READY mode appears on the digital display.
PV
SV
3.
Select “ON” with [
▲
] key or [
▼
] key, and enter with the “SEL” key.
Table 5.8-2 Setting of READY mode
Set value
Explanation
Default
Ready completion (TEMP READY) signal
OFF
✓
Ready completion (TEMP READY) signal ON
Setting/checking: READY bandwidth
4.
Press the [SEL] key once.
READY bandwidth (range between the upper and lower limit temperatures) setting
screen appears on the digital display.
PV
SV
Press and
hold [MENU]
key.
Press and
hold [MENU]
key.
Summary of Contents for HRS090-A
Page 8: ...HRX OM S004 Contents HRS Series...
Page 20: ...HRX OM S004 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS Series 2 6...
Page 56: ...HRX OM S004 Chapter 3 Transport and Setting Up 3 5 Circulating Fluid Supply HRS Series 3 36...