![SMC Networks HRS090-A Operation Manual Download Page 33](http://html1.mh-extra.com/html/smc-networks/hrs090-a/hrs090-a_operation-manual_1299245033.webp)
HRX-OM-S004
Chapter 3 Transport and Setting Up
HRS Series
3.3
Installation
3-13
3.3.3
Preparation and wiring of power supply cable
Be sure to lock out and tag out the breaker of the facility power supply
(customer power supply facility) before wiring.
z
The electrical facilities should be installed and wired in accordance
with local laws and regulations of each country and by a person
who has knowledge and experience.
z
Check the power supply. Operation with voltages, capacities and
frequencies other than the specified values can cause fire and
electrical shock.
z
Wire with an applicable cable size and terminal. Forcibly mounting
with an unsuitable size cable may result in heat generation or fire.
Be sure to connect the power supply cable from the product side first,
and then connect the breaker of the facility power supply (the user’s
machine power supply).
When the panel is removed or mounted, be sure to wear protective
shoes and gloves to prevent injury with the edge of the panel.
Summary of Contents for HRS090-A
Page 8: ...HRX OM S004 Contents HRS Series...
Page 20: ...HRX OM S004 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS Series 2 6...
Page 56: ...HRX OM S004 Chapter 3 Transport and Setting Up 3 5 Circulating Fluid Supply HRS Series 3 36...
Page 164: ......
Page 174: ......
Page 192: ...HRX OM S004 Chapter 8 Documents 8 9 Daily Check Sheet HRS Series 8 18...
Page 195: ......