HRX-OM-S004
Chapter 3 Transport and Setting Up
HRS Series
3.3
Installation
3-15
Preparation for operation
1.
Remove four screws to remove the front panel for the electrical unit.
Fig. 3-6 Remove the front panel for the electrical unit (This drawing shows air cooled type.)
Fig. 3-7 Remove the front panel for the electrical unit (This drawing shows water cooled type.)
Summary of Contents for HRS090-A
Page 8: ...HRX OM S004 Contents HRS Series...
Page 20: ...HRX OM S004 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS Series 2 6...
Page 56: ...HRX OM S004 Chapter 3 Transport and Setting Up 3 5 Circulating Fluid Supply HRS Series 3 36...
Page 164: ......
Page 174: ......
Page 192: ...HRX OM S004 Chapter 8 Documents 8 9 Daily Check Sheet HRS Series 8 18...
Page 195: ......