![SMC Networks HRS090-A Operation Manual Download Page 58](http://html1.mh-extra.com/html/smc-networks/hrs090-a/hrs090-a_operation-manual_1299245058.webp)
HRX-OM-S004
Chapter 4 Starting the Product
4.2
Preparation for Start
HRS Series
4-2
4.2 Preparation for Start
4.2.1
Power supply
Turn ON the breaker of the user’s power supply.
When the product is switched ON, the operation panel display operates as
shown below:
z
The initial screen (HELLO screen) is displayed for 8 seconds on the
operation display panel. Then, the display moves to the main display
which shows the circulating fluid outlet temperature.
z
The set circulating fluid temperature is displayed as SV on the digital
display.
z
The present circulating fluid temperature is displayed as PV on the
digital display.
4.2.2
Option B [Earth leakage breaker]
1.
Remove the front panel of the product and turn ON the power switch of the earth
leakage breaker inside the product.
Fig. 4-1 Position of the earth leakage breaker (This drawing is [HRS150-A-20-B].)
2.
Mount the front panel.
3.
Turn ON the power switch of the earth leakage breaker of the user's power supply.The
product will become in the state that is explained in “4.2.1 Power supply”.
Be sure to lock out and tag out the breaker of the facility power supply
(customer power supply facility) before wiring.
Summary of Contents for HRS090-A
Page 8: ...HRX OM S004 Contents HRS Series...
Page 20: ...HRX OM S004 Chapter 2 Name and Function of Parts 2 4 Operation display panel HRS Series 2 6...
Page 56: ...HRX OM S004 Chapter 3 Transport and Setting Up 3 5 Circulating Fluid Supply HRS Series 3 36...
Page 164: ......
Page 174: ......
Page 192: ...HRX OM S004 Chapter 8 Documents 8 9 Daily Check Sheet HRS Series 8 18...
Page 195: ......