Connecting the power-through cables (HANQ variant)
To allow the power provided to one system to supply the power
to another system in a daisy-chain, the input power is routed
directly from the mains input HANQ connector to the mains out‐
put connector in the same Terminal Housing.
1. Connect the Earth connection from the input HANQ connec‐
tor to the output HANQ connector.
2. Connect the L1 connection from the input HANQ connector
to the output HANQ connector.
3. Connect the L2 connection from the input HANQ connector
to the output HANQ connector.
4. Connect the L3 connection from the input HANQ connector
to the output HANQ connector.
Note:
The power-through cables are provided with the Terminal Hous‐
ing and are the correct size and dimensions to allow the power-
through connections to be made easily.
/
/
/