Configuring
4
4.1
Configuring ET 200eco PN
Requirements
You need STEP 7 as of version V5.4, SP4 and possibly HSP.
Introduction
ET 200eco PN is included in the hardware catalog of
HW Config
after the start of STEP 7.
Procedure
1. Start SIMATIC Manager.
2. Create a new project.
3. Configure the ET 200eco PN with
HW Config
.
4. Double-click on the technology module at slot 1 of the ET 200eco PN in the configuration
table and set the parameters.
5. Save the configuration, or download it to the IO Controller.
Prerequisite for the GSD file
You will need a GSD file, available for download from the Internet
(
http://support.automation.siemens.com/WW/view/en/19698639/133100
).
ET 200eco PN family:
gsdml-v2.2-siemens-et200eco"date format yyyymmdd".xml
Configuring ET 200eco PN on PROFINET IO using STEP 7
1. Start STEP 7 and call up the
Options > Install New GSD File
menu command in
HW
Config
.
2. In the next dialog box, select the GSD file to install, and confirm with "OK". Result:
ET 200eco PN is displayed in the hardware catalog, PROFINET IO folder.
3. The rest of the procedure is as described in the Programming with STEP 7
http://support.automation.siemens.com/WW/view/en/18652056
) manual.
See also
For further information, refer to the STEP 7 online help.
63
ET 200eco PN
Operating Instructions, 06/2022, A5E01250250-AN
Summary of Contents for SIMATIC ET 200eco PN
Page 233: ...ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN 234 Dimensional drawings C ...
Page 265: ...266 ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN Open Source Software ...
Page 278: ...ET 200eco PN Operating Instructions 06 2022 A5E01250250 AN 279 Y Y cable 37 Index ...