LITHOSTAR Multiline
RXL2-120.812.01
Page 2 of 2
Siemens AG
System
Rev. 02
10.04
CS PS 24
Medical Solutions
5 - 2
Final Work Steps
•
Remove all the protective plastic foil from the various operating panels.
•
Attach all the cabinet front panels.
•
Seal all seams between the system and the floor with silicone suitable for wet cells
(Fig. 4 and Fig. 5).
•
Complete the installation protocol in register 3 of the log book.
Adapting the Other Accessories
5
•
Perform a test installation of all accessories that have been included in the shipment in
accordance with the Operating Instructions
System
Insulating plate
Floor
Silicone
Silicone
Mounting plate
Fig. 3
Fig. 4
Silicone
Fig. 5