LITHOSTAR Multiline
RXL2-120.812.01
Page 6 of 14
Siemens AG
System
Rev. 02
10.04
CS PS 24
Medical Solutions
2 - 6
System Installation
•
Move the unit so that it is positioned correctly over the mounting plate and so that it is
level i.e., lower all four transport rollers evenly (Fig. 8).
•
Mount the unit using 12 bolts and insulating sleeves on the floor. Apply Loctite 221 on the
bolt threads to secure them (Fig. 9):
•
Remove the entire transport device.
•
Remove the yellow shipping brackets on the W-drive.
•
Measure the resistance to ensure that the unit is electrically isolated on the mounting
plate.
•
Carefully feed through the cable harnesses. Store any excess cable lengths. Roll them
up without kinks.
Do not place any excess cable or cable loops in the unit frame, since they may come into
contact with the moving energy chain and become damaged.
Do not block the movement of the energy chain.
•
Remove the transport safety bracket from the I.I. collision protection.
- 8x Recessed socket head
M 8 x 4 tighten to 24 Nm,
±
10%
- 4x Hex head
M10 x 25
(The bolts are contained in the box with service materials.)
Excess cable lengths may not be stored in the cabinets.
4 x
8 x
Fig. 8
Fig. 9
CAUTION