LITHOSTAR Multiline
RXL2-120.812.01
Page 4 of 14
Siemens AG
System
Rev. 02
10.04
CS PS 24
Medical Solutions
2 - 4
System Installation
Installing and Connecting the Cooling Unit
2
•
Place the cooling system on the rails provided in the shock wave cabinet A13 (under the
N12 electronics unit), slide it into position and secure it on the front using two screws.
•
Insert the hoses in the appropriate connections according to marking, and ensure that
they lock into position.
•
Plug the power line connector for the cooling system into the socket on the electronics
unit at N12.X3.
•
Connect the protective conductor between the cooling system and the shock wave
cabinet.
Setting Up the Unit
2
•
Place the four transport rollers (2/Fig. 4) onto the transport carriage on the yellow
shipping frame at (c/Fig. 5) and bolt them in place.
•
Remove the shipping pallet from the unit.
Lift the unit with the help of the spindles and pull the transportation pallets out to the side.
•
Depending on the dimensions of the transport route, it may be necessary to reposition
the rollers on the carriage (Pos. a or b in Fig. 5) and bolt them in place.
For this reason, the unit should be lowered on an appropriate wooden base.
•
Move the unit to its installation location and place it next to the mounting plate.
To avoid the risk of excessive heat build-up, make sure that the
ventilation inside and outside the cabinet is always sufficient.
When lowering the unit, the cable harnesses must not be dam-
aged.
ca. 1200
ca. 1100
ca. 1100
ca. 2300
ca. 2400
ca. 2620
a
b
c
2
Fig. 4
Fig. 5
CAUTION
CAUTION