![Segway SE-3 Patroller Service Manual Download Page 91](http://html1.mh-extra.com/html/segway/se-3-patroller/se-3-patroller_service-manual_1233838091.webp)
Service Manual
83
Figure 114: Rider Detect Mat Harness
Installation
1. Make sure the SE-3 Patroller is powered off,
unplugged, and the parking brake is engaged.
2. Orient the Rider Detect Mat on the SE-3 Patroller with
the wire harness toward the front.
3. Feed the wire harness through the hole in the frame.
4. Connect the wire harness to the left side of the PI
Board. See
Figure 113
.
5. Slide the Rider Detect Mat in place. The front should
rest under the tab and the rear should line up with the
threaded studs.
6. Using a 3 mm hex wrench, install the four fasteners
as shown in
Figure 112
.
Torque to
4.0 N-m (3.0 ft-lbf)
.
7. Install the following components:
a. Left Side Panel (
page 20
).
b. Light Cluster (
page 18
).
c. Front Cowl (
page 17
).
d. Glove Box (
page 16
).
e. Bib Panel (
page 14
)
f. Storage Trays (
page 13
).
g. Battery Module (
page 8
).
8. Perform post-service tests (
page 127
).
Rider Detect Mat
Summary of Contents for SE-3 Patroller
Page 1: ...Service Manual SE 3 Patroller...
Page 12: ...SE 3 Patroller 4 General Safety Precautions...
Page 18: ...SE 3 Patroller 10 Battery Module...
Page 76: ...SE 3 Patroller 68 Brakes...
Page 88: ...SE 3 Patroller 80 Siren...
Page 92: ...SE 3 Patroller 84 Rider Detect Mat...
Page 114: ...SE 3 Patroller 106 Power Interface...
Page 134: ...SE 3 Patroller 126 Harnesses...
Page 147: ......
Page 148: ...24538 00001 ad...