PRELIMINARY PAGES
4618–021
xi
QA INSPECTOR MODE (OPTION) ............................................................................................................................67
Introduction .............................................................................................................................................................67
Printer .....................................................................................................................................................................67
Configuring the Performance Validation Routine ...................................................................................................68
Line Identification....................................................................................................................................................68
Printer Fitted ...........................................................................................................................................................68
Printer Fixed/Portable .............................................................................................................................................68
Test Samples..........................................................................................................................................................69
Shift Report Options ...............................................................................................................................................69
Shift Report Interval ................................................................................................................................................70
Shift Report Start Time ...........................................................................................................................................70
Test Interval ............................................................................................................................................................71
Overdue Period.......................................................................................................................................................71
Alarm If Overdue.....................................................................................................................................................72
Change QA Operator Code ....................................................................................................................................72
QA OPERATOR MODE ..............................................................................................................................................74
Introduction .............................................................................................................................................................74
QA Operator Security Codes ..................................................................................................................................74
Carrying Out a Performance Check .......................................................................................................................74
Notes on the Test Sample ......................................................................................................................................74
Select Test Material ................................................................................................................................................74
VIEWING MODE..........................................................................................................................................................77
Introduction .............................................................................................................................................................77
REJECT TIMERS INTRODUCTION ...........................................................................................................................78
Recommended Applications ...................................................................................................................................78
Timer Groups A, B or C ..........................................................................................................................................78
Sample size selection .............................................................................................................................................78
tm1 TIMER...................................................................................................................................................................81
tm2[G] TIMER - NON GATED MODE ........................................................................................................................84
Introduction .............................................................................................................................................................84
tm2 settings.............................................................................................................................................................84
tm2G TIMER - GATED MODE ....................................................................................................................................88
tm3[G] TIMER - NON GATED MODE ........................................................................................................................94
Setting up Timer Type tm3 .....................................................................................................................................94
tm3[G] TIMER - GATED MODE..................................................................................................................................99
Setting up timer type tm3G in gated mode ...........................................................................................................100
SPEED SENSOR FOR THE TM3 AND TM3[G] TIMERS ........................................................................................109
Speed Sensor Requirements................................................................................................................................109
Speed Sensor Electrical Connections ..................................................................................................................109
Producing A Rotary Encoder Using A Proximity or Photo-electric Sensor...........................................................109
Disc Construction..................................................................................................................................................110
Determining The Required Shift Distance Of The Speed Sensor ........................................................................110
SETTING UP AND CONNECTING A PRINTER TO THE METAL DETECTOR ......................................................112
General .................................................................................................................................................................112
Requirements Of Your Serial Printer ....................................................................................................................112
Connection of Printer to Detector .........................................................................................................................113
SAMPLE PRINTED REPORTS.................................................................................................................................114
METAL DETECTOR SERIAL COMMUNICATIONS LINK .......................................................................................118
Introduction ...........................................................................................................................................................118
Host computer or intelligent equipment ................................................................................................................118
Summary of Contents for Signature
Page 16: ......
Page 26: ...INSTALLATION 10 4618 021 Fig 5 Typical Metal Detector Conveyor ...
Page 31: ...INSTALLATION 4618 021 15 Fig 10 Cable Gland Assemblies for Power Supply Unit ...
Page 52: ...OPERATING INSTRUCTIONS 36 4618 021 Fig 14 Supervisor Mode Flow Chart ...
Page 55: ...OPERATING INSTRUCTIONS 4618 021 39 Fig 15 Engineer Mode Flow Chart ...
Page 71: ...OPERATING INSTRUCTIONS 4618 021 55 Fig 16 Pack Sensor Mode Flow Chart ...
Page 82: ...OPERATING INSTRUCTIONS 66 4618 021 Fig 18 QA Inspector And Operator Flow Chart ...
Page 92: ...OPERATING INSTRUCTIONS 76 4618 021 Fig 19 Viewing Mode Flow Chart ...