4. Installation
4-7 Connecting the power and signal cables
57 / 168
4-7 Connecting the power and signal cables
4-7-1 Main unit cable and device connectors
The cable and device connectors on the main unit are as follows:
<SD-3>
<SD-3SC>
・
Power supply and signal
cables, max 2.0 mm
2
(shielded)
・
Lightning arrester (TP-48)
<Optional>
・
Power supply and signal
cables, max 2.0 mm
2
(shielded)
・
Lightning arrester
(TP-48)
<Optional>
・
HART modem connector
(Cannot be used in
explosion-proof areas)
Contact output
max 2.0 mm
2
(shielded)
<Optional>
・
Power supply and signal
cables, max 2.0 mm
2
(shielded)
・
Lightning arrester
(TP-48)
<Optional>
・
HART modem connector
(Cannot be used in
explosion-proof areas)
Contact output
max 2.0 mm
2
(shielded)
・
Power supply and signal
cables, max 2.0 mm
2
(shielded)
・
Lightning arrester (TP-48)
Remote sensor head (GD-3) connector cable,
max 2.0 mm
2
(shielded twisted pair)
Summary of Contents for GD-3EC
Page 169: ...11 Appendix Revision History 169 168...
Page 170: ...11 Appendix Revision History 170 168...
Page 171: ...11 Appendix Revision History 171 168...
Page 172: ...11 Appendix Revision History 172 168...
Page 173: ...11 Appendix Revision History 173 168...
Page 174: ...11 Appendix Revision History 174 168...
Page 175: ...11 Appendix Revision History 175 168...