4. Installation
4-4 Main unit installation
48 / 168
4-4 Main unit installation
4-4-1 Vertical pole mounting
Mount the main unit (SD-3/SD-3SC) to a vertical pole (size: 50A (2B)) using two U bolts.
1 Fit one U bolt around the vertical pole and through the upper slots on the main unit.
2 Secure the U bolt to the main unit with two washers, two spring washers, and two M10 nuts.
3 Fit the second U bolt around the vertical pole and through the lower slots on the main unit.
4 Secure the U bolt to the main unit with two washers, two spring washers, and two M10 nuts.
*The diagram illustrates the SD-3. The mounting method for the SD-3SC is identical.
Upper slots
Lower slots
U bolts
Vertical pole
Summary of Contents for GD-3EC
Page 169: ...11 Appendix Revision History 169 168...
Page 170: ...11 Appendix Revision History 170 168...
Page 171: ...11 Appendix Revision History 171 168...
Page 172: ...11 Appendix Revision History 172 168...
Page 173: ...11 Appendix Revision History 173 168...
Page 174: ...11 Appendix Revision History 174 168...
Page 175: ...11 Appendix Revision History 175 168...