Page 508
CHAPTER 5
May/12
9107
SERVICE MANUAL
CHAPTER 5
Page 508
Feb/11
283
SERVICE MANUAL
ISO 9650
3.3.9 Pass/Fail Criteria
RAFT SIZE (persons)
4
6
8
10
12
PASS CRITERIA - %
GAIN MUST NOT EXCEED 30
30
35
50
50
3.3.10 Recording of the Post Operational Packing Vacuum Test, shall be
done on the testing card, Appendix 2. The Start Pressure, End
Pressure and % gain are to be recorded. Pass/Fail must be deleted
as appropriate. The operational technician or inspector’s stamp must
be put on the form.
3.4 Repair to the H-pack
After the container has been strapped:
If the container is failing the vacuum pressure tests, please carry out the
following steps:
3.4.1 Remove the container straps.
3.4.2 Reapply the vacuum test and check /listen for leaks around the
H-pack.
3.4.3 Check all welded seams, operating head seals, indicator valve and
vacuum valve.
3.4.4 If a leak is detected, repair it with the heat sealing tool.
3.4.5 Finish the packing process.
3.4.6 Repeat the Post Operational Packing Vacuum test.