Page A2-4
APPENDIX 2
May/12
9107
SERVICE MANUAL
Page A2-4
Oct/11
APPENDIX 2
SERVICE MANUAL
283
ISO 9650
1.3 Prepare the container bottom half, (FIGURE A2-04);
1.3.1 Fix protection foam block to the inside of the container, This foam
block prevents the cylinder operating head from impacting the
container side, during handling and deployment.
NOTE:
This protection block will need to be cut to the correct
size, depending on the container type being used.
1.3.2 Line the bottom half of the container with a polythene sheet.
Ensure this sheet overlaps the front edge of the container by
200 mm (8“).
Preparation of Flat Pack container
FIGURE A2-04