Page A2-12
APPENDIX 2
May/12
9107
SERVICE MANUAL
Page A2-12
Oct/11
APPENDIX 2
SERVICE MANUAL
283
ISO 9650
2.29 Using the painter line from the H-Pack, tie it to a strong point on the liferaft,
(FIGURE A2-14).
(a) On 6/8 Person use the liferaft painter patch.
(b) On 10/12 Person use the liferaft painter cord line.
NOTE:
The painter line should be able to move freely along the
cord.
2.30 Set the painter sachet to the side of the jig. Ensure the open end of the
painter sachet is close to the jig at the painter line cut-out.
CAUTION:
EXERCISE EXTREME CARE DURING THE NEXT
OPERATION IN ORDER TO AVOID OPERATING THE
INFLATION SYSTEM.
2.31 Place the boarding ladder neatly under liferaft, (FIGURE A2-15).
NOTE:
Applies to 10-12 Person ONLY.
2.32 Work the liferaft f
l
oor area down into the recesses towards each end of the
jig
.
2.33 Pack the Emergency Pack valises for the liferaft, (refer to Chapter 7). Ensure
the straps on each Emergency Pack valise are tight.
2.34 Tie the paddles opposite to each other, (FIGURE A1-17). Place foam
padding over the ends of the paddles.
CAUTION:
FOR 10-12 PERSON ENSURE THAT THE EMERGENCY
PACKS ARE PLACED UNDER THE HAULING-IN LADDER.
ENSURE NO PARTS OF THE CANOPY OR DOOR ARE
TRAPPED BENEATH THE PACKS.
CAUTION:
FOR 6-8 PERSON ENSURE THAT THE EMERGENCY
PACKS ARE PLACED UNDER THE ARCH TUBE.