SERVICE MANUAL
Page A2-3
APPENDIX 2
9107
May/12
Page A2-3
Oct/11
APPENDIX 2
SERVICE MANUAL
283
ISO 9650
1. Container preparation
The following preparation is used for Throw Over liferafts 6-12 Persons.
1.1 Drill drain holes in the container as required. Please refer to Chapter 8,
section 4.1 for holes positioning.
1.2 Drill rivet holes in Flat Pack, new supply containers only, (FIGURE A2-03):
NOTE:
Containers being opened for servicing will have holes
present
1.2.1 Place the top half of the container onto the bottom half, so that the
container is in the fully closed position.
1.2.2 Measure the hole positions at the left hand and right sides of the
container handle. All dimensions are in millimet
er
s.
1.2.3 Drill a 7 mm diameter hole through both halves of the container.
1.2.4 Repeat step 1.1.3 for the opposite container handle.
Preparation of Flat Pack container
FIGURE A2-03