Page A2-18
APPENDIX 2
May/12
9107
SERVICE MANUAL
Page A2-18
Oct/11
APPENDIX 2
SERVICE MANUAL
283
ISO 9650
2.42 Prepare to start the sequence of liferaft rolling;
NOTE:
The boarding ramp must be twisted and folded down
before rolling of liferaft can begin.
For the 6-8 liferaft the boarding ramp must be laid
parallel with the fold.
2.42.1 Flat Pack container; Refer to (FIGURES A2-20 to 22).
6 PERSON - 1 fold LHS, 1 fold RHS, then roll.
2.42.2 Flat Pack container; (Refer to FIGURE A2-21).
8-12 PERSON - 1 fold LHS, 1 fold RHS, then roll.
CAUTION:
ENSURE THE LIGHT AND BATTERY ARE NOT PLACED
ON TOP OF EACH OTHER. BOTH SHOULD BE PLACED
TO THE LEFT OF THE ROLL AND OFF CENTER,
TOWARDS THE PAINTER EXIT.
NOTE:
If the light and battery are found to be on top of the roll
then liferaft must be unrolled and begin again.
2.43 Pressing down as tight as possible, roll the liferaft towards and then into
the container. For the 6-8 liferaft ensure the boarding ramp bar remains
horizontal with the jig.
NOTE:
Liferaft bulk must be in the center of the container. This
will make the closing of the jig easier.
2.44 Open out and place the green drogue on top of the final roll, (FIGURE A2-
22).
2.45 Flake the drogue line neatly along the back of the H-Pack, (FIGURE A2-22).
2.46 Wrap the H-Pack over the liferaft, (FIGURE A2-23).
2.47 Tie the loose end of the painter line to the H-Pack, using a bowline knot,
(FIGURE A2-23). Tape the flying end.
2.48 Obtain the pre-heated, 150 mm long welding hand tool, (see listing Chapter
10).