Add a Scheduled Background Activity
To add a new scheduled background activity:
1.
Click the
Administration
tab.
2.
Click the
Background Activities
tab.
The list of background appears.
3.
Click the
Background Activity Scheduler
button.
The list of currently scheduled background activities appears.
4.
Click the
Add Schedule
button.
5. In the new menu, choose the option (radio button) for the activity you want:
• Redundancy Check
• Spare Check
6.
Check the box to
Enable This Scheduler
if you want to make the schedule active. (Remove check if you
want to disable.)
7.
Choose a
Start Time
from the drop-down menus.
The menus have a 24-hour clock.
8.
Choose a
Recurrence Pattern
option, daily, weekly, or monthly.
• For the Daily option, enter an interval in the Every field.
• For the Weekly option, enter an interval in the Every field
and choose one or more days of the week.
• For the Monthly option, choose, Day of the Month option then choose a number from the
drop-down menu.
The day of the week option then choose the day of the month from the drop-down menus.
9.
Choose a
Start From
date from the drop-down menus.
10. Choose an E
nd On
option,
• No end date or perpetual.
• End after a specific number of activity actions.
• Until date from the drop-down menus.
122
Promise
Technology
VTrak D5000 Series