START UP (SERVICE)
Before starting up the system, make sure that all connections have been made correctly and, in
general, that all safety conditions have been complied with. In particular, make sure that all
voltage values are within the set limits.
Chapter §21
12.1.
Operating conditions
The following diagram gives an indicative illustration of the various functional phases of the
inverter.
ENERGY SAVE
STAND-BY
RECOVERY
FAULT o ASSENZA RETE
NUOVO TENTATIVO
CONNESSIONE
ALLA RETE
MPPT
A
S
S
E
N
Z
A
I
L
L
U
M
IN
A
Z
IO
N
E
FAULT/ ASSENZA
RETE
PRESENZA
SOLE
PRESENZA
SOLE e RETE
ASSENZA SOLE
(Timeout)
ASSENZA
SOLE
PRESENZA
SOLE e RETE
Figure 12-1: Inverter's operation diagram