Installation and Operation Manual
Page 91 of 156
[PVI-XXX.0-YY(-TL) - Rev:1.0]
d.
If the primary conditions
1
(presence of
DC and AC voltage) are satisfied, the
system will automatically connect to
the AC grid:
•
The Slave are connected to the grid
with the Master.
•
The LED is on. POWER ON
•
At every connection, the system
makes a complete scan of the field
to identify the maximum power
point. In this phase there is a
sudden increase in power, then a
decrease,
and
then
another
increase. This phase lasts less than
5 seconds.
1
The conditions for connection to the grid
vary according to the country in which the
inverter is sold.
e.
At this point, the Master or Masters
will show the power sent to the grid
and
other
parameters.
The
visualisation of various parameters on
the display occurs cyclically unless the
“locked” symbol appears on the
display. Otherwise, it is necessary to
act manually (by means of the arrows)
to obtain the visualisation.
Chapter §13