Translation of the Original Operating Instructions
perma MP-6 Distributor
Table of Contents
The distributor perma MP-6
1
Quick Reference Guide
2
1.
Miscellaneous
3
1.1
Delivery / Content
1.2
Markings
1.3
Intended Usage
1.4
Legal Requirements
2.
Safety Instructions
5
2.1
Persons Responsible for Safety
2.2
General Safety Instructions
2.3
Safety Information for perma MP-6
3.
Technical Data
6
3.1
Design of the perma MP-6 Distributor
3.2
Accessories
4.
Assembly and Mounting of the Distributor
8
4.1
Mounting the Connections
4.2
Distributor Housing
4.3
Combination of Distributor and Lubricator
5.
Operation and Control
11
5.1
Preparations
5.2
Prior to Operation
5.3
Setting into Operation
5.4
During Operation
5.5
Switching the Complete Lubrication System On
5.6
Switching the Complete Lubrication System Off
5.7
Determining the Discharge Period
5.8
Setting the Discharge Period
5.9
Activation of Outlets
5.10
Initialization of Distributor
6.
Trouble Shooting
16
6.1
Error Messages of the Distributor on the Display of the Lubricator
6.2
Trouble Shooting Guide
7. Disposal
17
8.
Service
17
Summary of Contents for Distributor PRO MP-6
Page 3: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Page 4: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...
Page 77: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Page 78: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...