perma PRO
- 12 -
PRESS
Short
Short
Long > 4 sec. until
the display content
changes completely
Long > 4 sec. until
the display content
changes completely
BUTTON
MODE
SAVE
figure 11
ON/OFF
SELECT
figure 12
MODE
SAVE
figure 11
ON/OFF
SELECT
figure 12
FUNCTION
Selection
in current
display
Changing of
values
Moves to new menu and
saves selected values
Returns to original menu
without saving changes
chart 3, figure 11, figure 12
5.4
Control Buttons
There are two push-buttons on the control unit (refer to figure 8) which can be used for a menu-guided change of
the settings.
♦ With the MODE/SAVE button (refer to figure 11), you can reach the configuration menu, change the mode
and save the modified settings for further operation.
♦ With the ON/OFF SELECT button (refer to figure 12) you can do the following: turn lubricator On/Off, increase
discharge period (Days, Weeks, Months - each time you press the button increases the discharge period by
one calendar unit), change PRO LC unit size, activate MP-6 outlets and set PIN.
6.
Operation and Control
6.1 Preparations
♦ Prior to the installation of the lubricator, the lubrication point and the complete connection tube must be
sufficiently prelubricated with the same lubricant that the PRO LC unit contains. For this, perma-tec offers a
400 g lubrication cartridge for grease presses with the corresponding lubricant (refer to “Accessories and
Spare Parts”).
♦ When installing the perma PRO, the supplied perma-tec mounting device should be used.
♦ The lubricant tube must be installed and mounted correctly. The length of the lubricant tube may not exceed a
maximum of 5 meters and the tube must be a perma-tec product.
♦ Please check if the thread of the perma PRO (G3/8) corresponds to the connection thread of the lubrication
point. If this is not the case, you can order a corresponding reducer or other parts from the perma accessory
range.
For the initial setting into operation of a perma PRO, the pump system in the drive unit is pre-filled with
SF04 from perma’s standard range of lubricants. An exception is made with regard to lubricants for the food
industry. A complete discharge of this pump filling is guaranteed after approx. 10 discharges (carry out additional
discharges, if necessary).
6.2
Prior to Operation
♦ Check all parts of the lubricator for obvious damages!
♦ Is the new PRO LC unit filled with the required lubricant?
♦ Did you insert a new battery set?
♦ Did you remove protection cover, disc and plug from drive unit (see chapter 1.2)?
♦ Did you assemble and mount all of the parts correctly and tightly?
Summary of Contents for Distributor PRO MP-6
Page 3: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Page 4: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...
Page 77: ...Chap 4 3 perma PRO MP 6 Distributor Drilling template...
Page 78: ...45 75 66 5 6 5 Drilling template Screws M6 2x Fasting points 3x Fasting points...