
Clarus 500 GC Installation Guide
81
1.
Locate a size 1A CO
2
cylinder equipped with a fitting containing a full-length dip
(eductor) tube and approximately 27.3 kg (60 lb) of carbon dioxide.
2.
Connected to the CO
2
supply tubing (P/N N600-0404) is an envelope containing a
Teflon gasket. This goes inside the nut on the tubing before attaching it to the tank.
Connect the large nut on one end of the CO
2
supply tubing to the CO
2
tank fitting by
turning the nut clockwise until it is finger-tight. To provide a leak-free connection,
tighten the nut an additional half-turn with a large adjustable wrench.
3.
Connect the 1/4-in. nut on the other end of the tubing to the 1/4-in. union on the rear
of the Clarus 500 GC by turning the nut clockwise until it is finger-tight. To provide a
leak-free connection, place a 9/16-in. wrench on the nut and a 1/2-in. wrench on the
bulkhead fitting, then tighten the nut an addition half-turn.
WARNING
The CO
2
supply system contains liquid CO
2
pressurized at 6000 kPa (870 psig)
at 20°C (68°F). Before breaking connections to change cylinders, shut off the
liquid CO
2
cylinder valve, then bleed the supply tubing by closing the oven door
and adjusting the oven temperature below 60°C (140°F). This opens the coolant
solenoid valve and allows the CO
2
supply tubing to bleed.
4.
Turn on the valve and check for leaks.
Summary of Contents for clarus 500 gc
Page 1: ...Clarus 500 GC Installation Guide ...
Page 5: ...Introduction 1 ...
Page 6: ......
Page 12: ...Introduction 12 Label locations on instrument ...
Page 13: ...Safety Practices 2 ...
Page 14: ......
Page 33: ...Preparing Your Laboratory 3 ...
Page 34: ......
Page 43: ...Clarus 500 GC Installation Guide 43 Sample Preparation Requirements Customer Responsibility ...
Page 45: ...Installing the Clarus 500 GC 4 ...
Page 46: ......
Page 58: ...Installing the Clarus 500 GC 58 ...
Page 59: ...Connecting the Gases and Electrical Supply 5 ...
Page 60: ......
Page 82: ...Connecting the Gases and Electrical Supply 82 Figure 22 Connecting the CO2 or LN2 supply ...
Page 84: ...Connecting the Gases and Electrical Supply 84 Table 2 Plugs Used in Different Countries ...
Page 88: ...Connecting the Gases and Electrical Supply 88 ...
Page 89: ...Connecting the Accessories 6 ...
Page 90: ......
Page 92: ...Connecting the Accessories 92 Figure 24 ElCD Control Unit front panel ...
Page 106: ...Connecting the Accessories 106 ...
Page 107: ...PPC Restrictor Information 7 ...
Page 108: ......