Installation
2-3
3160-A2-GB22-10
December 1996
FRACTIONAL T1
NETWORK
T1
T1
T1
LAN
ROUTER
LAN
ROUTER
LAN
ROUTERS
496-14313a-01
ACCULINK
3160/3164 DSU/CSU
ACCULINK
3160/3164 DSU/CSU
ACCULINK
3160/3164 DSU/CSU
Figure 2-3. Multiport T1 DSU/CSU in a Fractional T1 Network Configuration
Figure 2-4. Central-Site T1 Termination Configuration
Summary of Contents for ACCULINK 316x
Page 4: ...ACCULINK 316x DSU CSU C December 1996 3160 A2 GB22 10 Notices...
Page 23: ...Introduction 1 9 3160 A2 GB22 10 December 1996 Figure 1 6 Auxiliary Backplane...
Page 77: ...Operation 3 35 3160 A2 GB22 10 December 1996 Figure 3 24 Example Channel Allocation...
Page 135: ...A 1 3160 A2 GB22 10 December 1996 Front Panel Menu A...
Page 136: ...ACCULINK 316x DSU CSU A 2 December 1996 3160 A2 GB22 10...
Page 137: ...Front Panel Menu A 3 3160 A2 GB22 10 December 1996...