Maintenance
4-3
3160-A2-GB22-10
December 1996
Test Commands
The test commands enable you to run loopbacks and
test patterns on the DSU/CSU, and to test the front panel
LEDs. These tests can help you isolate areas of trouble in
case you are having problems with your 316x DSU/CSU.
Access all Test commands from the Test branch of the
front panel menu tree (see Figure 4-1).
Figure 4-1. Test Branch
Differences Using the Async Terminal: For the async
terminal interface, the Test branch differs from the front
panel Test branch in both organization and selection. The
async terminal’s full-screen display organizes the test
selections into tests run on the T1 interface and tests run
on ports, as shown in Figure 4-2.
Figure 4-2. Test Branch for Async Terminal
Summary of Contents for ACCULINK 316x
Page 4: ...ACCULINK 316x DSU CSU C December 1996 3160 A2 GB22 10 Notices...
Page 23: ...Introduction 1 9 3160 A2 GB22 10 December 1996 Figure 1 6 Auxiliary Backplane...
Page 77: ...Operation 3 35 3160 A2 GB22 10 December 1996 Figure 3 24 Example Channel Allocation...
Page 135: ...A 1 3160 A2 GB22 10 December 1996 Front Panel Menu A...
Page 136: ...ACCULINK 316x DSU CSU A 2 December 1996 3160 A2 GB22 10...
Page 137: ...Front Panel Menu A 3 3160 A2 GB22 10 December 1996...