ACCULINK 316x DSU/CSU
4-16
December 1996
3160-A2-GB22-10
Displaying DSU/CSU Test Status
Use the Test Status command to display the active tests
for the DSU/CSU. Status messages that can display on the
front panel LCD are listed in Table 4-4.
Table 4-4
Test Status Messages
Message
Description
No Test Active
No tests are currently active.
LLB Test Active
The network interface is in Line loopback.
PLB Test Active
The network interface is in Payload loopback.
DLB Test Active
The DSX-1 Drop/Insert port (DTE) is in DTE loopback.
RLB Test Active
The DSX-1 Drop/Insert port (DTE) is in Repeater loopback.
DCLB on Port
n
Port
n is in a data channel loopback.
DTLB on Port
n
Port
n is in a data terminal loopback.
QRSS Test Active
A QRSS test pattern is being sent on the network interface.
1–8 Test Active
A 1-in-8 test pattern is being sent on the network interface.
QRSS on Port
n
A QRSS test pattern is being sent to the network on the channels allocated to port
n.
511 on Port
n
A 511 test pattern is being sent to the network on the channels allocated to port
n.
Monitoring QRSS
The QRSS test pattern is being monitored on the received network interface signal.
Mon QRSS, Port
n
A QRSS test pattern is being monitored on the channels allocated to port
n.
Mon 511, Port
n
A 511 test pattern is being monitored on the channels allocated to port
n.
DLB Test, Extrn
The DSX-1 Drop/Insert port (DTE) is being held in DTE loopback by the external contact.
Lamp Test Active
The Lamp test is currently active.
Summary of Contents for ACCULINK 316x
Page 4: ...ACCULINK 316x DSU CSU C December 1996 3160 A2 GB22 10 Notices...
Page 23: ...Introduction 1 9 3160 A2 GB22 10 December 1996 Figure 1 6 Auxiliary Backplane...
Page 77: ...Operation 3 35 3160 A2 GB22 10 December 1996 Figure 3 24 Example Channel Allocation...
Page 135: ...A 1 3160 A2 GB22 10 December 1996 Front Panel Menu A...
Page 136: ...ACCULINK 316x DSU CSU A 2 December 1996 3160 A2 GB22 10...
Page 137: ...Front Panel Menu A 3 3160 A2 GB22 10 December 1996...