Installation
2-1
Chapter 2:
Introduction
This chapter describes the installation of your LoaderXpress. It includes:
•
Unpacking
•
Installation Notes
•
Tabletop Placement & Setup
•
Rack Mount Installation (If applicable)
•
Inserting & Removing Cartridges
•
Interface Descriptions
•
Host Computer Connection
•
Power Source Connection I/O
•
Configuration Options Descriptions
Unpacking
1) Visually inspect the shipping container and notify your carrier immediately
of any damage.
2) Following the directions in the shipping container, unpack the unit.
3) Verify the contents against the packing list. If parts are missing or the
equipment is damaged, notify your representative.
4) Save the packing materials for re-use in case you need to return the loader to
Overland Storage for repairs.
Installation
Summary of Contents for LoaderXpress
Page 1: ...Part No 104249 102 04 2004...
Page 3: ......
Page 5: ...xii...
Page 6: ...xiii...
Page 12: ...1 6...
Page 16: ...2...
Page 22: ...1 6 Introduction TAPE CARTRIDGE MAGAZINES...
Page 50: ...2 28 Installation CONFIGURATION OPTIONS DESCRIPTIONS...
Page 98: ...5 20 Troubleshooting USING THE DEMO SUBMENU...