![background image](http://html.mh-extra.com/html/omron/zx-e/zx-e_operation-manual_1633397077.webp)
75
ZX-E
Operation Manual
Sec
tio
n 4
M
e
a
s
ur
in
g Thic
k
ne
s
s
Section 4
MAIN APPLICATIONS AND SETTING METHODS
Mounting to Device
■
Connecting Amplifier Units
Connect two Amplifier Units by placing a Calculating Unit between them as shown in
the diagram.
The calculation result is displayed on (i.e., output to) the CH2 Amplifier Unit. Connect
the CH2 output cable to the external device to enable external control.
Connections, p. 34
The CH1 Amplifier Unit will display (output) the measurement result for the CH1 Sensor Head only.
■
Mounting Sensor Heads to Inspection Device
Refer to the following diagram and prepare mounting jigs. Mount the Sensor Heads fac-
ing each other.
Installing Sensor Heads, p. 30
Calculating Unit
Mounting jigs
(resin or metal)
Set screws
Z166-E1-02A.book Page 75 Friday, June 3, 2005 4:18 PM
Summary of Contents for ZX-E -
Page 4: ...2 Preface ZX E Operation Manual Preface ...
Page 8: ...6 Preface Contents ZX E Operation Manual Preface ...
Page 11: ...9 ZX E Operation Manual Preface PREFACE ...
Page 12: ...10 Preface ZX E Operation Manual PREFACE ...
Page 17: ...Section 1 FEATURES 15 ZX E Operation Manual Section 1 FEATURES ZX E Features 16 ...
Page 24: ...22 Section 1 ZX E Features ZX E Operation Manual Section 1 FEATURES ...
Page 62: ...60 Section 3 Adjusting Linearity ZX E Operation Manual Section 3 BASIC OPERATION ...
Page 162: ...160 Appendices Quick Reference for Displays ZX E Operation Manual APPENDICES ...