manualshive.com logo in svg
background image

www.masterbattery.es

01

4 CONNECTING STEPS TO USE UE-12Li100BL IN SERIES

Connecting Steps:

3 Connect the batteries according to the pictures below with the finished wires in step 2, and make 

sure the anode that comes out from 

PACK4

 is on the positive pole, while the cathode that comes 

out from 

PACK1 

is on the negative pole.

2

a

: Weld OT connectors and wires tightly.

b

: Cover the connecting part, between OT connectors and wires, with the Heat Shrink Tube.

a

b

1 Preparation Material

OT connector

10PCS

(Bare >100A current)

Heat Shrink Tube

10PCS

(4cm/PC)

Wires (Bare > 100A,

Length depends on

customer)

UE-12Li100BL

4PCS

(Voltage difference < 0.2V)

INSTALLATION MANUAL 

Отзывы: