![background image](http://html.mh-extra.com/html/omron/zx-e/zx-e_operation-manual_1633397043.webp)
41
ZX-E
Operation Manual
S
ect
io
n
2
C
o
nfir
ming W
a
rm
-up Comple
tion
Section 2
PREPARATIONS FOR MEASUREMENT
Confirming Warm-up Completion
When the power is turned ON in RUN or T Mode, the sub-display will flash
W-UP
to show that
the Sensor is warming up. Warm-up requires approximately 5 to 15 minutes. When warming
up has been completed, the normal display will be shown.
Measurement operations can be performed while in warm-up display status, but the precision of
measurements before warming up has been completed will be low. For high-precision measure-
ments, wait until warming up has been completed.
SUB
Z166-E1-02A.book Page 41 Friday, June 3, 2005 4:18 PM
Summary of Contents for ZX-E -
Page 4: ...2 Preface ZX E Operation Manual Preface ...
Page 8: ...6 Preface Contents ZX E Operation Manual Preface ...
Page 11: ...9 ZX E Operation Manual Preface PREFACE ...
Page 12: ...10 Preface ZX E Operation Manual PREFACE ...
Page 17: ...Section 1 FEATURES 15 ZX E Operation Manual Section 1 FEATURES ZX E Features 16 ...
Page 24: ...22 Section 1 ZX E Features ZX E Operation Manual Section 1 FEATURES ...
Page 62: ...60 Section 3 Adjusting Linearity ZX E Operation Manual Section 3 BASIC OPERATION ...
Page 162: ...160 Appendices Quick Reference for Displays ZX E Operation Manual APPENDICES ...