Precautions for Correct Use
32
CJ-series EtherNet/IP Units Operation Manual for NJ-series CPU Unit (W495)
• Be sure to install a replacement Battery within two years of the production date shown on the Battery
label.
• Turn ON the power after replacing the Battery for a CPU Unit that has been unused for a long time.
Leaving the CPU Unit unused again without turning ON the power even once after the Battery is
replaced may result in a shorter Battery life.
• When you replace the Battery, use the CJ1W-BAT01 Battery Set.
• Insert the SD Memory Card all the way.
• Do not turn OFF the power supply to the Controller during SD Memory Card access. The files may be
corrupted.
If there is a corrupted file in the SD Memory Card, the file is automatically deleted by the restoration
function when the power supply is turned ON.
Battery Replacement
SD Memory Cards
Summary of Contents for SYSMAC CJ1W-EIP21
Page 8: ...Manual Structure 6 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 42: ...Revision History 40 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 68: ...1 Introduction 1 26 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 266: ...9 FTP Server 9 20 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 431: ...Index 1 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495 I Index...
Page 436: ...Index 6 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495 Index...
Page 437: ......