7-37
7 Tag Data Link Functions
CJ-series EtherNet/IP Units Operation Manual for NJ-series CPU Unit (W495)
7
-2
Se
tti
n
g T
a
g D
a
ta
Li
n
k
s
7
7-2
-5 Con
nection Settings
Confirming the Connections Settings
1
An overview of the connections that were set in the Register Device List is displayed in the Con-
nections Tab Page.
2
Click the
OK
Button. The following kind of diagram is displayed.
3
Repeat the connections setting procedure until all of the connections are set.
Precautions for Correct Use
Precautions for Correct Use
After you have made all of the settings, always click the
OK
Button before you close the Edit
Device Parameters Dialog Box. If the
Cancel
Button is clicked and the dialog box is closed, the
new settings are discarded.
4
If the tag set’s size is changed in either the originator or target after the connection was set, the
size will not match the other node and a parameter data mismatch will occur. In this case, if you
change the connection settings, be sure to check the connections. (Refer to 7-2-16 Checking
Connections.)
Indicates the IP address
of the originator where the
connection was set.
Summary of Contents for SYSMAC CJ1W-EIP21
Page 8: ...Manual Structure 6 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 42: ...Revision History 40 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 68: ...1 Introduction 1 26 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 266: ...9 FTP Server 9 20 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495...
Page 431: ...Index 1 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495 I Index...
Page 436: ...Index 6 CJ series EtherNet IP Units Operation Manual for NJ series CPU Unit W495 Index...
Page 437: ......