CPT7 and CPT7700 Installation and Operation User Manual v12
5
4.3.3 Configure the CPT7 IMU Data Rate
4.3.4 SPAN Configuration for CPT7
4.3.5 Importance of RBV Calibration
4.4.1 System Start-Up and Alignment Techniques
4.4.2 INS Seed / Fast INS Initialization
4.4.5 Recommended Messages to be Logged for SPAN Data Collection
4.4.6 Body to Vehicle Frame Rotation Calibration Routine
4.4.7 Multi-Line Body to Vehicle Frame Rotation Calibration Routine
4.5 Distance Measurement Instrument
4.5.5 DMI Command Compatibility
4.6 Synchronizing External Equipment
4.6.1 Configuring an Input Strobe
4.7 Adding Timed Sensor Triggers
4.7.1 Configuring the Hardware
4.7.2 Configuring the Software
4.7.3 Using Timed Event Pulses
4.7.4 Recording Incoming Sensor Events
4.8 Azimuth Sources on a SPAN System
4.9 Data Collection for Post Processing
4.10.1 Reference Frame Description
4.10.2 How to Use Variable Lever Arm
Chapter 5 CPT7 with Dual Antenna
5.2 Configuring Dual Antenna ALIGN with SPAN
5.3 Configuring SPAN Alignment Method