Troubleshooting 8-9
IMPORTANT:
To abort rebuilding, power off the server. In such a
case, restart the server, hot-swap the failed hard disk, and restart
rebuilding. Observe the following notes to use the auto-rebuild
feature.
Do not power off the server. (If the server is powered off before
rebuilding hard disks, the auto-rebuild feature will not start.)
When you removed a hard disk, wait at least 90 seconds before
installing the hard disk back again.
Do not replace another hard disk while rebuilding is in progress.
AC Standby Lamp
The power supply bay on the front of the server has the AC standby lamp.
Default configuration
If the power cord is connected to the AC inlet1 to supply AC power to the power supply
unit, the SB1 lamp goes on green.
Redundant configuration
If the power system of the server is in the redundant configuration with optional power
supply unit and the power cords are connected to the AC inlet1 and AC inlet2 to supply
AC power to the all power supply units, the SB1 and SB2 lamp go on green. After turning
on the server, the AC_R lamp also goes on green.
AC Standby
lamp
SB1 lamp
AC_R lamp
SB2 lamp
Summary of Contents for Express5800/140Rc-4
Page 10: ...iv This page is intentionally left blank ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Page 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Page 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Page 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Page 362: ...A 2 Specifications This page is intentionally left blank ...
Page 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...