3-8 Setting Up Your Server
No.
Item
Q'ty
Remarks
1
Front bezel
1
2
Slide rail assembly (L)
1
"L" is stamped on the rail.
3
Slide rail assembly (R)
1
"R" is stamped on the rail.
4
Cable arm
1
5
Adapter bracket
1
6
Handle (L)
1
7
Handle (R)
1
8
Arm bracket (700)
1
9
Arm bracket (900)
1
Use one according to the distance between the
front and rear vertical mounting rails of your rack
cabinet.
10
Arm stopper
1
11
Template
1
12
Tie-wrap
6
25 cm long.
13
Lock spring
1
Used to fix the power cords.
14
Screw-A
6
CPIMSx#8-32x6
15
Screw-B
7
CPIMSx6-32x8
16
Screw-C
14
CBIMS×5×10×3GF
17
Screw-D
6
PL-CPIMSx4x8x15BF
18
Washer-A
12
M5-14 (Assembled with Screw-C.)
19
Washer-B
4
PIWAx5x15BF (Assembled with Screw-D.)
Required Tools
#2 Phillips screwdriver and flat tip screwdriver are recommended for assembling the rack-mount
system.
Summary of Contents for Express5800/140Rc-4
Page 10: ...iv This page is intentionally left blank ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Page 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Page 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Page 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Page 362: ...A 2 Specifications This page is intentionally left blank ...
Page 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...