9-12 Upgrading Your Server
6.
Connect two power cords.
Use the power cord provided with the standard power supply unit and the one provided
with the optional unit. The AC Standby lamps (the SB1 and SB2 lamps) go on when the
power cords are connected.
IMPORTANT:
Dust cover is attached to the AC inlet 2 connector. Keep the
removed dust cover for future use.
Fasten the power cords with the lock spring.
7.
Power on the server.
The POWER lamp on the power supply units goes on. When the server is redundant
power supply configuration, AC_R lamp on the front of the server goes on.
8.
Confirm, by the STATUS lamp or on the POST diagnostic screen, that there are no errors
related to the power supply units.
See Chapter 8 for details on the error messages.
If the POWER lamps are off, reinstall the power supply units. If the POWER lamps are
still off, contact your sales representative.
AC Standby lamps (SB1 and
SB2 lamps) go on.
AC inlet for additional power
supply unit
Summary of Contents for Express5800/140Rc-4
Page 10: ...iv This page is intentionally left blank ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Page 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Page 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Page 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Page 362: ...A 2 Specifications This page is intentionally left blank ...
Page 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...