Upgrading Your Server 9-59
Installation
Take the following steps to install the CPU.
NOTE:
To clarify the explanation, the duct of the retention may be
omitted in the following figures.
1.
See the section "Preparing for Installation and Removal" described earlier to prepare.
2.
Pull out the server from the rack.
3.
Remove the rear access cover.
4.
Remove the CPU access cover.
5.
Remove the memory board.
6.
Remove the processor board air duct.
7.
Remove the processor board.
8.
Locate the CPU socket which you are going to install CPU and remove the socket cover
from the socket.
9.
Raise the locking lever on the socket.
IMPORTANT:
Open the lever until it stops. It can be opened to
approx. 120 degrees.
Retention
OK
NG
Summary of Contents for Express5800/140Rc-4
Page 10: ...iv This page is intentionally left blank ...
Page 34: ...1 18 Notes on Using Your Server This page is intentionally left blank ...
Page 93: ...Setting Up Your Server 3 21 21 Install the front bezel Now the installation is completed ...
Page 110: ...3 38 Setting Up Your Server This page is intentionally left blank ...
Page 196: ...5 40 Installing the Operating System with Express Setup This page is intentionally left blank ...
Page 286: ...8 48 Troubleshooting This page is intentionally left blank ...
Page 360: ...9 74 Upgrading Your Server This page is intentionally left blank ...
Page 362: ...A 2 Specifications This page is intentionally left blank ...
Page 400: ...F 4 Product Configuration Record Table This page is intentionally left blank ...